Price Determinations – Gas transmission in the NEM

AER – Australian Energy Regulator

Aug 20
Price Determinations – Gas transmission in the NEM

Amadeus Gas Pipeline (2016-2021) – NT

This is the only gas transmission price determination underway at present.

Amadeus’ regulatory proposal for the 5 years from 2015 was submitted to the AER on 4 Aug 2015.  Public submissions on the proposal are required by 2 Sep 2015.  The proposed Weighted Average Cost of Capital (WACC) is 8.3%.

The draft decision is expected by the end of Nov 2015.